News Center
-
Correct installation and use of differential pressure gauges
2024/11/6
The installation and commissioning of the pressure differential gauge is one of the important and necessary links to ensure that the pres...
-
Optical super clean room laboratory design
2024/11/6
Ultra-clean dust-free purification workshop is now an indispensable important hardware facility for industrial semiconductor, precision part...
-
Study on clean room heating ventilation and smoke control system
2024/11/6
The design of heating, ventilation and smoke control system in clean room is of great significance for ensuring indoor environment quality a...
-
Laboratory design planning space standard specification
2024/11/6
"Huainan Zi · General Lecture" : "Build soil and wood, think the palace." Structure is the foundation and soul of laboratory design, withou...
-
Air duct area calculation
2024/10/31
When installing the air duct, it is necessary to consider its size and area, and the air duct area is calculated as follows: 1, the area of...
-
How to do fire control and evacuation design for integrated circuit clean workshop project
2024/10/31
Integrated circuit clean building projects require special attention in terms of fire and evacuation design, because such plants often invol...